Himech Equipments is a leader in the design of oilfield equipment. Himech Equipments specialises in supplying flare and burner boom equipment.
Himech burner booms extend 'Sea Dragon' crude oil burners and gas flares at a set distance from an installation. This allows produced hydrocarbons to be flared safely, moving the radiated heat away from the installation.
Himech flare booms are a portable U-shaped truss assembly. The King Post attaches to the rig structure and is braced with three tieback struts. Vertical suspension cables and horizontal wind stay cables support the boom, so a rig crane is not needed for support.
Himech burner booms have been installed with three head 'Sea Dragon' burners, allowing division of the flame into three independent smaller flames. This increases the amount of air available for combustion, provided by the injection of air into the mixing chamber as well as ambient.
Available in 60ft, 90ft and 120ft lengths, the company's burner booms feature a modular design that allows for easy upgrading. The lightweight structure of the boom reduces the crane capacity requirement and simplifies the installation process.
A U-shaped configuration helps provide added security for personnel using the boom. A boom attachment point at the kingpost easily accepts the boom into U-shaped slots, thereby further cutting the installation time.
The burner boom assembly features a wide range of components. The burner head assembly consists of three burners, cone type outer covering for burner, water spray line, set of heat resistant valves and a gas flow line.
The pilot ignition system uses LPG / propane gas for the Sea Dragon burners. The system works on 120V / 220V AC and 50Hz / 60Hz power supply.
A complete manifolding arrangement of piping and valves facilitates the selective use of any one or several of the burners at a time to achieve more efficient disposal. The U-shaped design of the boom structure supports burner heads, provides safe walkways and supports all piping for oil, gas, water and LPG / propane.
The heavy-duty king post assembly can be attached to rig structures and braced with three tieback struts. The burner boom is attached to the king post at the rotating pivot point and is supported by vertical suspension cables.
Technical data
Dynamic and environmental conditions
Rolling: +/- 7.5 deg drilling vessel (max period 12s) Pitching: +/- 5 deg drilling vessel (max period 12s) Heaving: +/- 1g drilling vessel
We supply non return valves on oil and air lines.
Manufacturing codes
We adhere to the following manufacturing codes: ASME Sec VIII Div 1, ANSI / ASME B 31-3 and NACE MR 01-75.
Confirmation
Det norske veritas.
Himech Equipments Pvt Ltd
Regd Office: 13/A Patel Ind Estate, Pratapnagar
Vadodara - 390004. Gujarat
Admin Office : 175 GIDC
Makarpura, Vadodara – 390010.
Gujarat
India
Contact: Mr. Harjeet Singh
Contact: Mr. Jaspreet Singh
Tel: +91 265 2633238
Tel: +91 265 2644808
Fax: +91 265 2656104
Email:
himech@gmail.com
URL:
www.himech.com