Abana,

Specifications - Abana, Gulf of Guinea, Nigeria


FieldAbana
Locationblock OPL230, offshore Nigeria
Operatorbrass exploration / moni Pulo
Locationnigeria on block OPL230
water depth4.8m (7.6m at highest tide).
100-year wave2.1m
100- year wind (1 hourly mean)18m/s
Discovery1997
oil column50ft
drillstem tests3,000 b/d
API27deg.
the barge Specifications
Pitch1.6deg (head seas -- hs 2.1m)
Heave1.5m (head seas -- hs 2.1m)
Surge2.7m (head seas -- hs 2.1m)
Roll0.2deg (beam seas -- hs 0.8m)
Yaw0.03deg (beam seas -- hs 0.8m)
production Capacity
oil processing/ export system50,000 barrels/day;
water treatment40,000 barrels/day
water injection system52,500 barrels/day
future gas compression facility30 million ft3/day
gas flare and tower40 million ft3/day
ClassifiedLloyds
Flaggedpanamanian Flag
Fabricationgreat yarmouth Port.
Barge
Length90m
Width25m
Powertwo 3.3mw gas turbines
standby generatorone 1mw diesel
emergency generatorone 400 kW.
fuel gas steam GeneratorOne
BS&W0.5%
oxygen content:30 ppb
water disposal overboard25 ppm free oil in water.
accommodation unit40-man
fire ratingA60
life boatstwo solas 40 man enclosed.
one hardy 24 workboat.
Helideckbell 212/s76c or similar
Cranehydraulic crane of 8-ton capacity
Mooringpiled dolphin mooring system
production wellsnine horizontal production wells
(five were from the abana east cluster four from abana West.
water injectiontwo deviated
cluster locationsThree
total footage drilled86,000 ft
total footage drilled horizontally23,200 ft
drilling operations completedjanuary 1999
Featured Suppliers
Geo Therm - Thermal Imaging Services
Rockbestos-Surprenant Cable Corp - Specialty Wire and Cables
Twin Filter - Offshore Filtration Equipment and Consumables


client logon
Home
New On This Site
Products & Services
Company A-Z
Special Features
White Papers
Jobs & Careers
Industry News
Advertise With Us
Events & Exhibitions
Newsletter
About Us
Atom FeedRSS Feed
What is RSS?