The Åsgard B production platform is linked to the accommodation flotel Safe Britannia.
-
The appraisal well on the Åsgard field, with the flare system in operation. -
The Åsgard B topside modules awaiting assembly. -
Rockwater installed two pipe bundles, 3.8km in length with a 44in carrier... -
The Asgard A FPSO is 278m long and has a displacement of 184,300t. -
The turret of the Åsgard A floating production vessel merges with the... -
The Åsgard B production platform is linked to the accommodation flotel Safe... -
Delivery of the Åsgard hull by the Mighty Servant 3.