The development drilling at Athena is being carried out using the anchored semi-submersible drilling rig Sedco 704.
-
The Athena field is being developed as a subsea tieback to the FPSO BW Carmen. -
The development drilling at Athena is being carried out using the anchored... -
The first appraisal well at the Athena field was spudded in September 2006.