BBLT, Block 14

Specifications - BBLT, Block 14 Compliant Piled Tower (CPT), Angola


Key Data
Project TypeCompliant Piled Tower (CPT)
LocationDeepwater block 14, Angola
Water Depth1,280ft
Total Height1,680ft (512m) from sea floor to top of derrick
Project Phases2
Key Players
OperatorCabinda Gulf Oil Co. Ltd. (Chevron) 31%
PartnersAgip Angola 20%, Sonangol 20%, Total Angola 20% and Petrogal Exploration 9%
Phase One
LocationBenguela and Belize fields
Wells30
Well Slots40
Phases Two and Three
LocationLobito and Tomboco fields
Combined Production200,0100b/d by 2008
Main EPIC ContractDaewoo ($820m)
TopsidesDaewoo at Okpo, South Korea
Operating Weight43,500t
Accommodation157 berths
ContractorDelta Engineering at Channelview, Texas
Other EngineeringDrilling template, piles, flare boom and helideck
Weight1,600t+
Jacket
Tower Base Section and Template26,000t
ContractorKiewit Offshore
Top Section8,000t
ContractorGulf Marine Fabricators
Foundation Piles12
Weight11,000t
FabricatedIngleside, Texas
Subsea
ContractorsSubsea 7 ($270m) and Vecto Gray ($125m)
Drilling RigKCA / Deutag and National Oilwell Varco ($120m)
Drilling Depth30,000ft
Hook Load1.3mmlb
Draw Works4,600hp
Top Drive60,000lbft torque
Mud Pumps3 x 2,200hp pumps rated to 7,500psi
Total Mud Volume4,625bbl
Installation VesselThialf
Maximum Lift10,470t
Featured Suppliers
Dillinger Hütte GTS - Steel Heavy Plate


client logon
Home
New On This Site
Products & Services
Company A-Z
Special Features
White Papers
Jobs & Careers
Industry News
Advertise With Us
Events & Exhibitions
Newsletter
About Us
Atom FeedRSS Feed
What is RSS?