The Sahara before conversion.
-
Map showing the field and the FPSO location. -
The Yorktown carrying out drilling operations. -
Schematic of field layout. -
The Tosia Perseus which will be used in the laying of the flexible pipe. -
The Fluminense which will be used on the field. -
The Sahara before conversion.