The pipeline consists of three main parts. The route comprises a 222-mile section in Russia from Izobilnoye to Dzhugba on the Black Sea Coast.
-
In 1998, Russia and Turkey signed an intergovernmental agreement for the sale... -
The pipeline consists of three main parts. The route comprises a 222-mile... -
The gas pipeline is designed with a capacity of 16 billion cubic metres per... -
The basic and detailed design phases of the pipeline were awarded to Saipem... -
The pipelines system also required 17km of 652mm OD by 52.7mm buckle... -
A consortium of Nippon Steel, Sumitomo, NKK and Klawasaki steel supplied...