Blue Stream Natural Gas Pipeline,

Specifications - Blue Stream Natural Gas Pipeline, Russia/Turkey


Key Data
OperatorGazprom/Eni
Contract565 billion cubic feet per year
EPCI contractorSaipem
Pipeline costUS$3.4 billion
Capacity16 billion cubic metres
SectionsIzobilnoye to Dzhugba (222 miles), Dzhugba to Samsun across the Black Sea (235 miles), Samsun to Ankara (300 miles)
PipelineTwin 24in OD steel lines
Wall thickness31.8mm
Line distance5m and 100m
VesselCastoro Otto (shallow water up to 380m), Saipem 7000 (deep water up to 2,150m)
Joint length48.8m
Buckle arrestors17km of 652mm OD by 52.7mm
Bracelet anodes10,438 from the UK, 15, 032 from Singapore
Featured Suppliers
Detector Electronics Corporation - Optical Flame and Combustible and Toxic Gas Detection Systems
Dillinger Hütte GTS - Steel Heavy Plate
Fisher Offshore - Offshore and Subsea Equipment and Seabed Excavation Services
MEDC - Explosion Proof Alarm, Signal, Control and Communications Equipment


client logon
Home
New On This Site
Products & Services
Company A-Z
Special Features
White Papers
Jobs & Careers
Industry News
Advertise With Us
Events & Exhibitions
Newsletter
About Us
Atom FeedRSS Feed
What is RSS?