Bundles of pipeline, ready to be joined.
-
The pipe-in-pipe fabrication base at Evanton. -
The CSO Apache was used to lay the pipe. -
A seismic section, through the reservoir. -
Pipe from the stern of the Apache. -
Sedco 711, drilling on Cook. -
Bundles of pipeline, ready to be joined. -
Fabrication of the pipeline.