Thunder Horse Field, Gulf of Mexico, USA

 

Key Data:

Location
Mississippi Canyon 778/822, 150 miles SE of New Orleans
Operator
BP (75%)
Partner
ExxonMobil (25%)
Water depth
6,050ft (at PDQ location)
Design life
25 years
Annualized average throughput - oil
250,000b/d
Annualized average throughput - gas
200mmcf/d
Produced water peak
140,000b/d
Water injection (max)
300,000b/d
Topsides layout
3 production / utilities modules
Topside modules lift weight
21,000t
Main power generation capability
90MW
Derrick
2,000,000lb maximum with auxiliary hoisting capability
Quarters
229 persons
Hull weight
75,000t
Hull displacement
129,000t
Mooring
16 x 5¾in wire rope and chain with suction pile
Main deck
112m x 136m
Normal draft
30m
Pontoon height
11.5m
Deck freeboard
17.5m
Discovery announced
15 July 1999
First oil
2005
Rescheduled oil and gas production
18 December 2008


Home
New On This Site
Products & Services
Company A-Z
Industry Projects
Special Features
Videos
White Papers
Industry News
Events & Exhibitions
Newsletter Sign-Up
Advertise With Us
About Us
Client Area


RSS What is RSS
The website for the offshore oil and gas industry