Lifting of the Gannet A barge into position.
-
The Sedco 704 drilling rig. -
Loading of the living-quarters/helideck module onto its recess on the main... -
The Gannet A topsides were loaded out under the transporter bridge, at Teesside. -
Installation of the subsea isolation valve. -
Lifting of the Gannet A barge into position. -
The Gannet A platform, on-stream. -
Aerial view of Gannet A and the Sedco 704 drilling rig.