The project is made viable through tying back the Hydro-operated Vega and Vega South fields back to Gjøa.
-
Statoil's Gjøa field lies in blocks 35 / 9 and 36 / 7 of the North Sea. -
The Gjøa field will be developed with a floating production platform. -
In June 2010 the Gjøa platform installation was completed by Aker and... -
The project is made viable through tying back the Hydro-operated Vega and...