Production in the second phase of field development using FPSO Cidade de Vitoria commenced in November 2007.
-
The Golfinho field is located in the EspĂrito Santo basin off the shore of... -
FPSO Capixaba was used during the first phase of the field development. -
FPSO Capixaba was converted from the 1974-built Stena Congress tanker. -
Production in the second phase of field development using FPSO Cidade de...