The gravity base structure at the deepwater site consists of a 105.5m concrete caisson, constructed using high-strength concrete, reinforced with steel rods and pre-stressed tendons.


Back to Project Details

cachename:Projectscachekey:rd287061489_796298130_rd221744618_-1113385435_rd-1665407042_-1874280820_rd-488908060_-173330816_