Upending the Mad Dog truss spar.
-
The Mad Dog drilling unit is located in 5,000ft to 7,000ft of water in Green... -
The deck was designed around the heaviest hook load available (around 8,000t). -
The field is being developed by 12 wells produced with a single-piece truss... -
The fabrication of the spar hull commenced in Finland in July 2002. -
The trus spar took three weeks to travel from Finland to Passagoula,... -
Upending the Mad Dog truss spar. -
Mad Dog truss spar hard tank sections.