Home > Industry Projects > North America > Mad Dog Field
Specifications - Mad Dog Field, Gulf of Mexico, USA
| Key Data |
| Name | Mad Dog |
| Location | Gulf of Mexico |
| Operator | BP |
| Distance from shore | 190 miles south of New Orleans |
| Water depth | 4,500ft |
| Equity | BP 60.5%, BHPBilliton 23.9%, Unocal 15.6% |
| Drilling unit range | 5,000ft to 7,000ft of water |
| Green Canyon blocks | 825, 826 and 782 |
| Reserves | 200 to 450 million barrels of oil equivalent |
| Development cost | $1.54 billion |
| Discovery well | May 1998, Green Canyon 826 |
| Water depths | 6,600ft |
| Measured depth | 22,410ft |
| Platform | Truss spar |
| Development | 12 wells |
| Block | Green Canyon Block 782 |
| Topsides | 220ft x 163ft x 50ft (67m x 50m x 15m) |
| Slots | 16 slots in a 4 x 4 pattern |
| Quarters | 126 persons |
| Temporary quarters | 60 persons |
| Rig operating weight | 5,500t |
| Hull weight | 20,871t |
| Throughput | 100,000 barrels oil, 60 mscf gas per day |
| Payload capacity | 18,500t excluding hull storage |
| Topside and decks | 10,500t |
| Mooring | 11-line (polyester) taut mooring: 2 x 4, 1 x 3 |
| Oil export | Caesar pipeline to Ship Shoal 332B, Cameron Highway Oil Pipeline System (CHOPS) |
| Gas export | Cleopatra pipeline to Ship Shoal 332A, Manta Ray Gathering System, Nautilus Gas Transportation into Louisiana |
| Featured Suppliers |
| Subsea Solutions - Well-Control and Rig Equipment Inspection |
| USFilter - A Siemens Company – Total Water Management |