Key Data:
Location
180 miles south of Cameron, Lousiana
Blocks
Garden Banks blocks 783 and 784
Equity
Conoco, (operator), 75%
Ocean Energy 25%
Drillship
Deepwater Pathfinder
Total development cost
$600 million
Rig Specifications:
Production facility
Tension Leg Platform (TLP)
Distance from nearest platform
30 miles
Hull design and construction services
ABB Lummus Global
Design
Four circular columns
Rectangular pontoons
Topsides engineering
Alliance Engineering
Capacity
275 million cubic feet per day
Capacity
75,000-barrel a day
Oil Field Data:
Field reserves
150 million barrels of oil equivalent
Production facilities
50,000 barrels of oil per day
150 million standard cubic feet of gas per day