Production started on 13 August 1998, when the capacity was 5,000bbls of oil/day and 50,000m³ of gas/day (1.8MMcfd), without gas lift.
-
The P-19 platform, operating in the Marlim field. -
The final development stage of the Marlim field will include seven foating... -
Petrobras 35 is capable of processing 100,000 bopd. -
Production started on 13 August 1998, when the capacity was 5,000bbls of...