Home > Industry Projects > Africa and the Middle East > Okume Complex
Specifications - Okume Complex, Equatorial Guinea
| Key Data |
| Name | Okume Complex |
| Operator | Hess (85%), Tullow (14.25%), GEPetrol (0.75%) |
| Location | Equatorial Guinea |
| First Oil | 14 December, 2006 |
| Gross Peak Production | 60,000bpd by 2008 |
| Block | G – Gulf of Guinea |
| Development | 2 x TLPs |
| | 3 x satellite platforms |
| | 1 x central processing platform |
| Storage and Loading | Sendje Ceiba FPSO |
| Construction | Samsung Heavy Industries, South Korea |
| Design, Engineering, Procurement and Construction of the Hulls, Topsides, Mooring, Drilling Riser and Production Riser Systems | MODEC |
| Trees | FMCs |
| Rated | 5,000psi with a 4-1/16in tree bore size |
| Pipe | Tenaris |
| Type | X65 seamless pipe |
| Length | 88,087m |
| Pipelay | Acergy |
| Wells |
| Discovery Well | Okume-1 oil |
| Total Depth | 9,570ft |
| Water Depth | 2,080ft |
| Pay | 200ft |
| Appraisal | Okume-2 – 153ft |
| | Okume-3 – 137ft |
| Total Wells | 43 |
| Types | Oil producers with gas lift, water injection and gas injection |
| Breakdown | 23 from the two TLPs |
| | 20 wells from three fixed platforms |
| TLPs | Oveng – 275m (902ft) of water |
| | Okume / Ebano in approximately 510m (1,673ft) of water |