Subsea completion to the platform, then to the shore.
-
Map of the Ormen Lange licence area showing the bathymetry. -
The Scarabeo 5, pictured, West Navigator and Leiv Eiriksson rigs were used to... -
Diagram of slope and subsea options. -
A spar with gas piped to a tie-in point. -
A spar with gas piped to the shore. -
Subsea completion to the shore. -
Subsea completion to the platform, then to the shore. -
3D map of the slope, showing the Storegga slide.