PM-3 Commercial Arrangement Area



The topsides were installed in a novel floatover operation using the COSCO Class 2 dynamic positioned (DP) Heavy Lift Vessel (HLV) Tai An Kou.


  • The topsides were installed in a novel floatover operation using the COSCO...

  • The PM-3 Commercial Arrangement Area (CAA) project centres on the...

  • This was the first floatover performed using DP control and the first such...

  • Development drilling of the 60-well programme commenced in October 2002.

  • The PM-3 CAA project will extract oil and gas from six different offshore...

  • Phase 1 oil production commenced in July 1997. Phases 2 and 3 achieved peak...

Back to Project Details


Related Suppliers

M3 Marine - Offshore Ship Broking and Consultancy Services
The M3 Marine group of companies (the M3 Marine Group), founded by...

See all suppliers

Related Projects

Britannia
The Britannia field, discovered in the mid 1970s, is the first in the...

Laminaria
Laminaria / Corallina is located in the Timor Sea, 550km north-west...

Ã…sgard, Norwegian Sea
The Ã…sgardoilfield lies on the Haltenbank in the Norwegian Sea, 200km...

Eastern Trough Area Project (Etap)
The Eastern Trough Area Project (Etap) is an integrated development of...

Gullfaks
Gullfaks South, Rimfaks and Gullveig lie in block 34 / 10, in a water...

See all projects


Follow Us:
Twitter Twitter   
Contact us
Advertise with us
Terms and conditions
Privacy
Links
Newsletter sign up
Online magazine sign up

offshore-technology.com is a product of Net Resources International. Copyright 2011 Net Resources International, a trading division of SPG Media Limited.