The PM-3 CAA project will extract oil and gas from six different offshore fields.
-
The topsides were installed in a novel floatover operation using the COSCO... -
The PM-3 Commercial Arrangement Area (CAA) project centres on the... -
This was the first floatover performed using DP control and the first such... -
Development drilling of the 60-well programme commenced in October 2002. -
The PM-3 CAA project will extract oil and gas from six different offshore... -
Phase 1 oil production commenced in July 1997. Phases 2 and 3 achieved peak...