Home > Industry Projects > Asia-Pacific > Stag
The topsides, in the form of a six-leg jack-up barge, were towed on top of the submerged jacket. Afterwards, the deck legs were lowered.
Copyright 2007 SPG Media Limited a subsidiary of SPG Media Group PLC