Installation of the Captain wellhead protector platform (WPP) in the field. The first of an estimated 350 million barrels of oil flowed from the field in December 1996 — both on time and within budget.
-
Completion of the Captain platform, with the addition of the topside. -
Installation of the Captain wellhead protector platform (WPP) in the field.... -
The Texaco Captain accomodation module. -
The shuttle tanker, MV Aberdeen, prior to its launch in Bilbao, Northern Spain. -
The FPSO Captain, prior to sailout. -
The Captain FPSO after its launch from El Ferrol, north-west Spain. A Tentech... -
The Captain FPSO on-station, offloading into a shuttle tanker.