The FPSO, which has been designed to cater to different types of offtake oil tankers, will handle 120,000 barrels of oil per day.
-
Four wells will be connected to an FPSO as part of the Tui Area Oil Project. -
The drilling operation includes using the Ocean Patriot for drilling up to... -
Three oil fields - Tui, Amokura and Pateke reserves located in PEP 38460, the... -
The FPSO, which has been designed to cater to different types of offtake oil...