Vallhall water injection field plan.
-
Plan of Valhall flank platform. -
Valhall flank jacket installed. -
Valhall flank topsides. -
Vallhall water injection field plan. -
Vallhall water injection topsides. -
Water injection is expected to improve the oil recovery factor from 31% to 38%. -
The platform configuration allows for drilling and maintenance of wells on...