Key Data:
Water depths
2,400ft to 3,400ft
Structure
Four-way dipping north-south oriented faulted anticline
Permeability
10mD to 1,000mD
Wells
West Seno 2 (205ft pay); West Seno 1 (270ft oil, 103ft gas); West Seno 5 (60ft oil, 141ft gas); West Seno 3 (24ft oil, 39ft gas); West Seno 7 (163ft oil); West Seno 8 (127ft oil, 97ft gas)
Production phase
August 2003
Production rates
40,000b/d
Export
12in diameter pipelines to Santan terminal, 40 miles away
Total pipeline length
59.5km
Tender assist vessel
West Alliance
Location
3 miles from TLP A
Mooring
Spread-moored barge
Processing capacity
60,000b/d oil, 150million ft³/d gas, 40,000b/d water
Reservoir support
50,000ft³/d gas