The Opti-Ex Floating Production System at the Who Dat field was installed by Delmar using an anchor handling vessel. Image courtesy of Delmar.
-
Who Dat oil and gas field is expected to come online towards the end of 2011. -
Opti-Ex Floating Production System has production capacity of 60,000 barrels... -
The Opti-Ex Floating Production System at the Who Dat field was installed by...