Home > Industry Projects > Africa and the Middle East > Xikomba Oil Field
|
The subsea facilities are connected to the surface by two 10in production risers. There are also two 8in water injection risers, an 8in gas injection riser and three umbilicals, which enter the FPSO at the swivel stack in the bow. |
|
|
|