Brae Central is a producing conventional oil field located in shallow water in the UK and is operated by TAQA Bratani. The field is located in block 16/7a ALL and 16/7b BRAE FIELD, with water depth of 394 feet.
Field participation details
The field is owned by Viaro Energy, Abu Dhabi National Energy, Stadtwerke Munchen, Centrica and JX Nippon Oil & Gas Exploration.
Production from Brae Central
The Brae Central conventional oil field recovered 98.94% of its total recoverable reserves, with peak production in 1992. The peak production was approximately 15.74 thousand bpd of crude oil and condensate and 19 Mmcfd of natural gas. Based on economic assumptions, production will continue until the field reaches its economic limit in 2026.
Remaining recoverable reserves
The field is expected to recover 0.79 Mmboe, comprised of 0.69 Mmbbl of crude oil & condensate and 0.58 bcf of natural gas reserves.
About TAQA Bratani
TAQA Bratani Limited is a wholly owned subsidiary of the Abu Dhabi National Energy Company.