Bullerengue is a producing conventional gas field located onshore Colombia and is operated by Lewis Energy Colombia. The field is located in block Ssjn 1.

Field participation details

The field is owned by Lewis Energy Group and Ecopetrol.


Production from Bullerengue

The Bullerengue conventional gas field recovered 17.04% of its total recoverable reserves, with peak production expected in 2022. The peak production was approximately 0.5 thousand bpd of crude oil and condensate and 32 Mmcfd of natural gas. Based on economic assumptions, production will continue until the field reaches its economic limit in 2054. The field currently accounts for approximately 1% of the country’s daily output.


Remaining recoverable reserves

The field is expected to recover 27.49 Mmboe, comprised of 2.14 Mmbbl of crude oil & condensate and 152.14 bcf of natural gas reserves. Bullerengue conventional gas field reserves accounts 0.01% of total remaining reserves of producing conventional gas fields globally.


Methodology

Information on the field is sourced from GlobalData’s fields database that provides detailed information on all producing, announced and planned oil and gas fields globally. Not all companies mentioned in the article may be currently existing due to their merger or acquisition or business closure.