Brooge Petroleum and Gas Investment will operate the upcoming Fujairah V refinery, proposed to be built at Al Fujayrah in the UAE. The non integrated refinery will be owned by Al Brooge International Advisory and Brooge Energy and is expected to start operations in 2023.


Key processes of the refinery

Crude Distillation Unit (mbd): 25
Vacuum Distillation (mbd): 12
Reformer (mbd): 5
Hydrotreater (mbd): 14


Subsequent expansion at the Fujairah V refinery will increase its refining capacity by 180mbd.

During the period 2021-2025, the Fujairah V refinery is expected to witness an estimated capex of $1,311.84m.

Contractors involved in the refinery

Some of the key contractors for the upcoming projects at the Fujairah V refinery include the following.

Design/FEED: MUC Oil & Gas Engineering Consultancy.

Main EPC: SENER Grupo de Ingenieria.

Methodology

Information on the refinery is sourced from GlobalData’s refinery database that provides detailed information on all active and upcoming, crude oil refineries and heavy oil upgraders globally. Not all companies mentioned in the article may be currently existing due to their merger or acquisition or business closure.