Lang Lebah is a conventional gas development located in shallow water in Malaysia and is operated by PTTEP HK Offshore. Discovered in 1994, Lang Lebah lies in block SK 410 B, with water depth of around 328 feet.
The project is currently in feed stage and is expected to start commercial production in 2026. Final investment decision (FID) of the project will be approved in 2023.
Field participation details
The field is owned by Petroliam Nasional, Kuwait Petroleum and PTT Public.
Production from Lang Lebah
Production from the Lang Lebah conventional gas development project is expected to begin in 2026 and is forecast to peak in 2039, to approximately 3,200 bpd of crude oil and condensate and 320 Mmcfd of natural gas. Based on economic assumptions, the production will continue until the field reaches its economic limit in 2048.
Remaining recoverable reserves
The field is expected to recover 343.64 Mmboe, comprised of 20.4 Mmbbl of crude oil & condensate and 1,939.44 bcf of natural gas reserves.
Contractors involved in the Lang Lebah conventional gas field
Some of the key contractors involved in the Lang Lebah project as follows.
Design/FEED Engineering: TechnipFMC
Other Contractors: Intecorr Consultancy Sdn
Methodology
Information on the field is sourced from GlobalData’s fields database that provides detailed information on all producing, announced and planned oil and gas fields globally. Not all companies mentioned in the article may be currently existing due to their merger or acquisition or business closure.