Longanesi is a conventional gas development located onshore Italy and is operated by Societa Padana Energia . Discovered in 2006, Longanesi lies in block Bagnacavallo, San Marco (862), and San Potito.

The project is currently in construction stage and is expected to start commercial production in 2022. The Longanesi conventional gas development will involve the drilling of approximately five wells.

Field participation details

The field is owned by Gas Plus , Bluescape Resources and Bonanza Energy.


Production from Longanesi

Production from the Longanesi conventional gas development project is expected to begin in 2022 and is forecast to peak in 2023, to approximately 66 Mmcfd of natural gas. Based on economic assumptions, the production will continue until the field reaches its economic limit in 2044.


Remaining recoverable reserves

The field is expected to recover 19.96 Mmboe, comprised of 119.79 bcf of natural gas reserves.


Contractors involved in the Longanesi conventional gas field

Some of the key contractors involved in the Longanesi project as follows.

Main EPC: Enereco and Max Strings GmbH & Co KG aA

Methodology

Information on the field is sourced from GlobalData’s fields database that provides detailed information on all producing, announced and planned oil and gas fields globally. Not all companies mentioned in the article may be currently existing due to their merger or acquisition or business closure.