Muralim PSC (CBM) is a cbm development located onshore Indonesia and is operated by Dart Energy (Muralim). Muralim PSC (CBM) lies in block Muralim (CBM).
The project is currently in feasibility stage and is expected to start commercial production in 2023.
Field participation details
The field is owned by NuEnergy Gas and PT Medco Daya Abadi Lestari.
Production from Muralim PSC (CBM)
Production from the Muralim PSC (CBM) cbm development project is expected to begin in 2023 and is forecast to peak in 2025, to approximately 13 Mmcfd of natural gas. Based on economic assumptions, the production will continue until the field reaches its economic limit in 2074.
Remaining recoverable reserves
The field is expected to recover 11.8 Mmboe, comprised of 70.82 bcf of natural gas reserves.
Methodology
Information on the field is sourced from GlobalData’s fields database that provides detailed information on all producing, announced and planned oil and gas fields globally. Not all companies mentioned in the article may be currently existing due to their merger or acquisition or business closure.