View all newsletters
Receive our newsletter - data, insights and analysis delivered to you
  1. Market Data
April 28, 2022

Muralim PSC (CBM) CBM Field, Indonesia

By Carmen

Muralim PSC (CBM) is a cbm development located onshore Indonesia and is operated by Dart Energy (Muralim). Muralim PSC (CBM) lies in block Muralim (CBM).

The project is currently in feasibility stage and is expected to start commercial production in 2023.

Field participation details

The field is owned by NuEnergy Gas and PT Medco Daya Abadi Lestari.


Production from Muralim PSC (CBM)

Production from the Muralim PSC (CBM) cbm development project is expected to begin in 2023 and is forecast to peak in 2025, to approximately 13 Mmcfd of natural gas. Based on economic assumptions, the production will continue until the field reaches its economic limit in 2074.


Remaining recoverable reserves

The field is expected to recover 11.8 Mmboe, comprised of 70.82 bcf of natural gas reserves.


Methodology

Information on the field is sourced from GlobalData’s fields database that provides detailed information on all producing, announced and planned oil and gas fields globally. Not all companies mentioned in the article may be currently existing due to their merger or acquisition or business closure.

Related Companies

NEWSLETTER Sign up Tick the boxes of the newsletters you would like to receive. The top stories of the day delivered to you every weekday. A weekly roundup of the latest news and analysis, sent every Friday. The industry's most comprehensive news and information delivered every month.
I consent to GlobalData UK Limited collecting my details provided via this form in accordance with the Privacy Policy
SUBSCRIBED

THANK YOU

Thank you for subscribing to Offshore Technology