Wareham is a producing conventional oil field located onshore the UK and is operated by Perenco UK. The field is located in block SY88b ALL and SY98a ALL.

Field participation details

The field is owned by Perenco Holdings, China Petrochemical and Repsol.


Production from Wareham

The Wareham conventional oil field recovered 99.15% of its total recoverable reserves, with peak production in 1992. The peak production was approximately 1.93 thousand bpd of crude oil and condensate. Based on economic assumptions, production will continue until the field reaches its economic limit in 2025.


Remaining recoverable reserves

The field is expected to recover 0.04 Mmboe, comprised of 0.04 Mmbbl of crude oil & condensate and 0 bcf of natural gas reserves.


Methodology

Information on the field is sourced from GlobalData’s fields database that provides detailed information on all producing, announced and planned oil and gas fields globally. Not all companies mentioned in the article may be currently existing due to their merger or acquisition or business closure.