Receive our newsletter – data, insights and analysis delivered to you
March 16, 2015

ABB wins contract to power Johan Sverdrup oil field in Norway

Statoil has awarded a NOK1.1bn ($155m) contract to Switzerland-based ABB for land-based power supply to the first phase of the Johan Sverdrup oil field development in Norway.

By admin-demo

Johan Sverdrup

Statoil has awarded a Nkr1.1bn ($155m) contract to Switzerland-based ABB for land-based power supply to the first phase of the Johan Sverdrup oil field development in Norway.

ABB will supply systems and equipment to two HVDC converter stations connecting the field with the onshore grid.

The company will design, engineer, supply and commission the equipment for two 80kV 100MW high-voltage converter stations.

The onshore station at Haugsneset will turn alternating current (AC) from the grid into high-voltage direct current (DC), which can be transmitted over 200km to the second station, which is on one of the oil platforms.

The DC current will then be converted back into AC and distributed to the rest of the field.

ABB process automation division president Peter Terwiesch said: "We are very pleased to be continuing our successful relationship with Statoil by delivering a third HVDC power-from-shore link.

Content from our partners
How the North of Tyne region is leveraging its legacy to define its future
Q&A with Chevron Lubricants’ Paul Sly, global industrial OEM specialist, and Nathan Knotts, global brand technical manager
The important role of antifoam agents in oil-gas separation and amine treating
"Using onshore electricity to run these oil platforms will eliminate the need for local gas-turbine power generation, significantly lowering CO2 emissions."

"Using onshore electricity to run these oil platforms will eliminate the need for local gas-turbine power generation, significantly lowering CO2 emissions, as well as operating and maintenance costs."

The Johan Sverdrup field, which is expected to cost in the range of Nkr170bn ($22.3bn) to Nkr220bn ($28.8bn), is estimated to hold 1.7 billion to three billion barrels of oil equivalent.

At plateau production, the field will account for approximately 40% of the total oil production on the Norwegian continental shelf. Operations are expected to start in late 2019.

Statoil will operate all phases of the field development and operation. The company’s partners include Lundin Norway, Petoro, Det norske oljeselskap and Maersk Oil.


Image: Johan Sverdrup field illustration. Photo: courtesy of Statoil.

Related Companies

NEWSLETTER Sign up Tick the boxes of the newsletters you would like to receive. The top stories of the day delivered to you every weekday. A weekly roundup of the latest news and analysis, sent every Friday. The industry's most comprehensive news and information delivered every month.
I consent to GlobalData UK Limited collecting my details provided via this form in accordance with the Privacy Policy
SUBSCRIBED

THANK YOU