Teledyne Oil & Gas group has won a contract from Cameron do Brasil to design and deliver a subsea high-power electrical interconnect system for a deepwater oilfield in Brazil.

The contract is for a development phase and will be followed by deliverable hardware prototypes to be installed in 2013 for a subsea system that will supply power to an electrical submersible pump to increase oil production.

The prototypes will supply power to an electrical submersible pump to augment oil production.

Completion of this contract will complement other high-power interconnect technology developed for other operators in the Gulf of Mexico.