Neptune

Neptune, Gulf of Mexico, USA

Neptune is located in the Gulf of Mexico in Atwater blocks 573, 574, 575, 617, and 618, approximately 120 miles from the coast of Louisiana. The water depths range from 4,200ft to 6,500ft. Recoverable reserves at the Neptune field are estimated to range between 100 and 150 million barrels of oil equivalent.

"Neptune is located in the Gulf of Mexico, approximately 120 miles from the coast of Louisiana."

BHP Billiton is designated operator, partners being Marathon Oil (30%), Woodside Energy (20%) and Repsol subsidiary Maxus Exploration (15%).

NEPTUNE DRILLING

Neptune was discovered in 1995 and marked the first discovery in the Western Atwater Foldbelt. An initial appraisal well (Neptune-2) was drilled in 1997. BHP Billiton took over operatorship in 2002.

In order to delineate the field, the operator subsequently drilled four more appraisal wells, with two sidetracks. These included Neptune-3, drilled in 2002, which encountered 120ft of net pay; Neptune-5, drilled in 2003, which found 500ft of net pay; and Neptune-7, drilled in 2004, which intersected 114ft of net pay.

Drilling and completion operations were executed using the ultra-deepwater Development Driller 1 semi-submersible drilling rig. In 2004 BHP Billiton signed a two-year contract with the drilling contractor GlobalSantaFe for the use of this rig in the GoM.

FIELD DEVELOPMENT

The Neptune field will be developed by a standalone Tension Leg Platform (TLP) which will be located in approximately 4,250ft of water. The TLP design is similar to the Chevron / BHP Billiton Typhoon platform in Green Canyon blocks 237 and 238.

This single-column TLP is of an Atlantia Seastar design. The field will be developed by seven initial subsea wells tied back to the TLP; the mini-platform does not have facilities for dry trees.

The Neptune facility will have a design capacity to produce up to 50,000 barrels of oil and 50 million cubic feet of gas a day. Produced water is estimated at 30,000 barrels a day. There will be permanent quarters for 26 people and temporary quarters for a further 24. The helideck is able to accommodate an S-92 helicopter.

The design has three deck levels. The deck has a length of 121ft (36.3m) by 110ft (33m). This is supported by a mono-column steel hull with a column height of 128ft (39m) and a diameter of 79ft (23m). There are three pontoons.

It is linked to the seabed by six tendons (three by two). These have a 36in (914mm) diameter and a 1.36in (34mm) wall thickness. The tendon segments are in lengths of 289ft (88m) and were supplied by Europipe. They are connected by Vetco connectors.

The tendons are anchored by six piles with a diameter of 96in and a 414ft pile length.

"Neptune was discovered in 1995 and marked the first discovery in the Western Atwater Foldbelt."

The design of the hull and topsides was carried out by SBM Atlantia, which procured and project managed the project. The topsides were fabricated by Gulf Island fabricators in Houma, Louisiana while the hull was manufactured by Signal International in Orange, Texas. They were assembled by Heerema Marine Contractors, which also installed the tendons and the platform using the Thialf. Gross costs for the development were originally estimated at approximately $850m but the total cost is now widely reported to be $1.2bn.

OIL AND GAS EXPORT

The oil and gas is exported by the Caesar and Cleopatra trunk lines, in which BHP Billiton holds a 25% and 22% interest respectively. The new laterals will be installed, owned, and operated by Enbridge Offshore (Gas Gathering) LLC. The oil export line is 20in diameter and runs 23 miles while the gas line is a 12.7in diameter, also with a length of 23 miles.

PRODUCTION

Production was due to have started by the end of December 2008 but was first deferred to the first quarter. Then, in March 2008, BHP Billiton said that during a routine inspection immediately prior to start-up of the TLP it had discovered 'structural anomalies' in its hull.

All personnel were removed until analysis showed the facility was safe, and while further inspection and assessment is underway to determine the appropriate course of action to mitigate the anomaly, the company says it now hopes to start up the field by the second quarter of 2008.

Printable Version Click here for printable version



Expand Image
Recoverable reserves at the Neptune field are estimated to range between 100 and 150 million barrels of oil equivalent.
Recoverable reserves at the Neptune field are estimated to range between 100 and 150 million barrels of oil equivalent.
Expand Image
Topsides installation. The spar supports a three-level integrated deck above the top of the hull, consisting of a clear workover deck, a mezzanine production deck and a main production deck.
Topsides installation. The spar supports a three-level integrated deck above the top of the hull, consisting of a clear workover deck, a mezzanine production deck and a main production deck.
Expand Image
An initial appraisal well (Neptune-2) was drilled in 1997. In order to delineate the field, the operator subsequently drilled four more appraisal wells, with two sidetracks.
An initial appraisal well (Neptune-2) was drilled in 1997. In order to delineate the field, the operator subsequently drilled four more appraisal wells, with two sidetracks.
Expand Image
The Neptune facility will have a design capacity to produce up to 50,000 barrels of oil and 50 million cubic feet of gas a day.
The Neptune facility will have a design capacity to produce up to 50,000 barrels of oil and 50 million cubic feet of gas a day.
FEATURED SUPPLIERS



client logon
Home
New On This Site
Products & Services
Company A-Z
Special Features
White Papers
Jobs & Careers
Industry News
Advertise With Us
Events & Exhibitions
Newsletter
About Us
Atom FeedRSS Feed
What is RSS?