China National Offshore Oil Corporation (CNOOC) has awarded a front-end engineering design (FEED) contract to French engineering firm Technip and its consortium partner China Offshore Oil Engineering Company (COOEC) for two tension leg platforms (TLPs).
The TLPs will be installed at the Liuhua 11-1 and 16-2 joint development project located in the South China Sea.
Discover B2B Marketing That Performs
Combine business intelligence and editorial excellence to reach engaged professionals across 36 leading media platforms.
TLP is a floating production platform anchored by tensioned cables to limit vertical movement caused by heavy swells. The platform design allows for the well heads to be located at the surface, on the platform.
Being the key technical partner to COOEC, Technip will conduct FEED work of China’s first two TLPs from its office in Houston, US.
Scheduled to be completed by the end of the year, work under the contract includes the design and engineering of the topsides, including two drilling rigs, hulls, mooring and riser systems.
The two fields Liuhua 11-1 and Liuhua 16-2 lie close to each other, at 370m of water depth.
US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataThe Liuhua 11-1 oil field is the largest oil field in the South China Sea.
This is the second contract win by Technip this week.
Previously, Technip was awarded a contract to replace the existing assets for the Triton floating production storage and offloading (FPSO) vessel, operated by Dana Petroleum, located in the central North Sea.
Located 193km east of Aberdeen, the FPSO produces oil and gas from Bittern, Guillemot West and North West, Clapham, Pict and Saxon.
