Baotian-Qingshan is a cbm development located onshore China and is operated by Greka Energy International. Baotian-Qingshan lies in block Baotian Qingshan (CBM).

The project is currently in construction stage and is expected to start commercial production in 2022.

Field participation details

The field is owned by China National Petroleum and G3 Exploration.


Production from Baotian-Qingshan

Production from the Baotian-Qingshan cbm development project is expected to begin in 2022 and is forecast to peak in 2025, to approximately 25 Mmcfd of natural gas. Based on economic assumptions, the production will continue until the field reaches its economic limit in 2053.


Remaining recoverable reserves

The field is expected to recover 12.18 Mmboe, comprised of 73.11 bcf of natural gas reserves.


Methodology

Information on the field is sourced from GlobalData’s fields database that provides detailed information on all producing, announced and planned oil and gas fields globally. Not all companies mentioned in the article may be currently existing due to their merger or acquisition or business closure.