Forties System (FPS) is a 378km-long onshore, shallow water pipeline project operated by Ineos FPS. This NGL pipeline, with a maximum diameter of 36 inches, starts at North Sea (the UK) and ends in Aberdeenshire (the UK).

The Forties System (FPS) project started operations in 1975 and is owned by Ineos.


The Forties System (FPS) project is associated with the 28km Buzzard Export.

Methodology

Information on the pipeline is sourced from GlobalData’s Oil & Gas Pipelines database that provides detailed information on all active and upcoming, crude oil, natural gas, petroleum products and Natural Gas Liquids (NGL) trunk pipelines globally. Not all companies mentioned in the article may be currently existing due to their merger or acquisition or business closure.