ITG “Greece Section” is an 87km-long onshore pipeline project operated by Hellenic Gas Transmission System Operator. This gas pipeline, with a maximum diameter of 36 inches, starts at East Macedonia and Thrace (Greece) and ends in East Macedonia and Thrace (Greece).

The ITG “Greece Section” project started operations in 2007 and is owned by Snam, Enagas, Publigaz, Copelouzos group, and others.


The ITG “Greece Section” project is associated with the 210km ITG “Turkey Section”.

About Hellenic Gas Transmission System Operator


Hellenic Gas Transmission System Operator SA (DESFA) operates manages, exploiters and develops national natural gas system and its interconnections. The company offers services including transmission, operation and maintenance of natural gas networks, compressed natural gas (CNG) and liquefied natural gas (LNG) facilities, protection of pipelines, natural gas odorization, and others. It also operates and maintains remote control and communication system, border metering stations, dispatching centers, and LNG terminal station. The company was spin off from DESFA S.A. DESFA is headquartered in Chalandri, Attica, Greece.

Methodology

Information on the pipeline is sourced from GlobalData’s Oil & Gas Pipelines database that provides detailed information on all active and upcoming, crude oil, natural gas, petroleum products and Natural Gas Liquids (NGL) trunk pipelines globally. Not all companies mentioned in the article may be currently existing due to their merger or acquisition or business closure.