The 365km-long, upcoming NGTL System Expansion Project IV will be operated by Nova Gas Transmission. This onshore, gas pipeline, with a maximum diameter of 48 inches, will start in Alberta (Canada) and ends in Alberta (Canada).

The NGTL System Expansion Project IV is expected to commence operations in 2022 and will be owned by TC Energy.


The NGTL System Expansion Project IV is associated with the 24494km NGTL System, 230km NGTL System Expansion Project and 68km NGTL System Expansion Project I.

During the period 2021-2025, the NGTL System Expansion Project IV is expected to witness an estimated capex of $1,258.67m.

Contractors involved in the NGTL System Expansion Project IV:

Some of the key contractors for the NGTL System Expansion Project IV include –

Main EPC: Macro Enterprises.

About NOVA Gas Transmission


Nova Gas Transmission Ltd. (NOVA) is a privately owned natural gas company. It is engaged in the transportation of natural gas through the transport system, which collects and transports natural gas for use in Alberta and delivers to connecting pipelines at the provincial borders for export to eastern Canada and to the US. NOVA has two natural gas pipelines one in the Fort McMurray oil sands region in northern Alberta and the other at Joffre, Alberta.The company is headquartered at Calgary, Canada. NOVA is a wholly owned subsidiary of TransCanada PipeLines Limited (TCPL). TCPL owns and operates an Alberta wide natural gas transportation system. The company has a fully owned subsidiary namely Ventures Limited Partnership.

Methodology

Information on the pipeline is sourced from GlobalData’s Oil & Gas Pipelines database that provides detailed information on all active and upcoming, crude oil, natural gas, petroleum products and Natural Gas Liquids (NGL) trunk pipelines globally. Not all companies mentioned in the article may be currently existing due to their merger or acquisition or business closure.