The 305km-long, upcoming North–Vest Romania Stage 3 project will be operated by Societatea Nationala de Transport Gaze Naturale TRANSGAZ. According to GlobalData, who tracks more than 8,000 active and developing pipelines worldwide, the onshore gas pipeline, with a maximum diameter of 27 inches, will start in Bihor (Romania) and ends in Mures (Romania). Buy the profile here.
The North–Vest Romania Stage 3 project is expected to commence operations in 2026 and will be owned by Societatea Nationala de Transport Gaze Naturale TRANSGAZ.
The North–Vest Romania Stage 3 project is associated with the 101km North–Vest Romania Stage two.
During the period 2021-2025, the North–Vest Romania Stage 3 project is expected to witness an estimated capex of $332.4m.
About Societatea Nationala de Transport Gaze Naturale TRANSGAZ
Societatea Nationala de Transport Gaze Naturale TRANSGAZ S.A. (Transgaz) is a natural gas company that transmits and distributes natural gas in Romania. The company’s activities include natural gas dispatching, transmission, international transit, and research design in the field of natural gas transmission. It also provides transmission services that include the network code, physical entry/exit points, interconnection procedure, and method for calculating capacity, virtual entry/exit points, natural gas quality, and procedures for usage, capacity allocation mechanism, procedure interruption capacity, flexibility and tolerance levels, emergency mechanism, and maintenance plan. Transgaz is headquartered in Medias, Sibiu, Romania.
For more details on the North–Vest Romania Stage 3 gas pipeline, buy the profile here.