Daandine is a producing cbm field located onshore Australia and is operated by Arrow Daandine. According to GlobalData, who tracks more than 34,000 active and developing oil and gas fields worldwide, the field is located in block PL 230. Buy the profile here.
An expansion project is associated with the Daandine, namely the Surat Gas Project – Daandine Phase 1. This project is currently in the construction stage, expected to start in 2023.
Field participation details
The field is owned by China National Petroleum and Shell.
Production from Daandine
The Daandine cbm field recovered 14.36% of its total recoverable reserves, with peak production expected in 2028. The peak production will approximately 670.00 Mmcfd of natural gas. Based on economic assumptions, production will continue until the field reaches its economic limit in 2049. The field currently accounts for approximately 2% of the country’s daily output.
Remaining recoverable reserves
The field is expected to recover 360.01 Mmboe, comprised of 2,160.04 bcf of natural gas reserves. Daandine cbm field reserves accounts 8.75% of total remaining reserves of producing cbm fields globally.
Contractors involved in the Daandine cbm field
Some of the key contractors involved in the Daandine project as follows.
Design/FEED Engineering: Worley
EPC Contractors: Altrad Investment Authority
For more details on the Daandine CBM Field, buy the profile here.