Muralim PSC (CBM) is a cbm development located onshore Indonesia and is operated by Dart Energy (Muralim). According to GlobalData, who tracks more than 34,000 active and developing oil and gas fields worldwide, lies in block Muralim (CBM). Buy the profile here.

The project is currently in feasibility stage and is expected to start commercial production in 2023.

Field participation details

The field is owned by NuEnergy Gas and PT Medco Daya Abadi Lestari.

Production from Muralim PSC (CBM)

Production from the Muralim PSC (CBM) cbm development project is expected to begin in 2023 and is forecast to peak in 2025, to approximately 13 Mmcfd of natural gas. Based on economic assumptions, the production will continue until the field reaches its economic limit in 2082.

Remaining recoverable reserves

The field is expected to recover 11.98 Mmboe, comprised of 71.90 bcf of natural gas reserves.

For more details on the Muralim PSC (CBM) CBM Field, buy the profile here.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Oil & Gas Intelligence Center, which provides detailed profiles of 34,000+ oil and gas fields, 400,000+ exploration blocks, 1,100+ LNG terminals, 3,400+ gas processing plants, 5,000+ storage terminals, and 8,000+ pipelines, 1,400+ refineries and 13,000+ petrochemical plants worldwide.