Narrabri Gas Project is a cbm development located onshore Australia and is operated by Santos NSW Hillgrove. According to GlobalData, who tracks more than 34,000 active and developing oil and gas fields worldwide, Narrabri Gas Project was discovered in 1963, lies in block PEL 238 and PPL 3 (NSW). Buy the profile here.
The project is currently in approval stage and is expected to start commercial production in 2026. Final investment decision (FID) of the project will be approved in 2023. The development cost is expected to be $2,410 m. The Narrabri Gas Project cbm development will involve the drilling of approximately 850 wells.
Field participation details
The field is owned by Santos.
Production from Narrabri Gas Project
Production from the Narrabri Gas Project cbm development project is expected to begin in 2026 and is forecast to peak in 2044, to approximately 142 Mmcfd of natural gas. Based on economic assumptions, the production will continue until the field reaches its economic limit in 2062.
Remaining recoverable reserves
The field is expected to recover 194.54 Mmboe, comprised of 1,167.23 bcf of natural gas reserves.
Contractors involved in the Narrabri Gas Project cbm field
Some of the key contractors involved in the Narrabri Gas Project project as follows.
EPC Contractors: Hitachi Zosen
Other Contractors: Ranbury Management Group