Scotia is a producing cbm field located onshore Australia and is operated by Bronco Energy. According to GlobalData, who tracks more than 34,000 active and developing oil and gas fields worldwide, the field is located in block ATP 868P and ATP 803P. Buy the profile here.

An expansion project is associated with the Scotia, namely the Scotia Phase 3. This project is currently in the feasibility stage.

Field participation details

The field is owned by Korea Gas, Petroliam Nasional, Santos and TotalEnergies.

Production from Scotia

The Scotia cbm field recovered 50.07% of its total recoverable reserves, with peak production in 2020. The peak production was approximately 83.00 Mmcfd of natural gas. Based on economic assumptions, production will continue until the field reaches its economic limit in 2054.

Remaining recoverable reserves

The field is expected to recover 41.73 Mmboe, comprised of 250.39 bcf of natural gas reserves. Scotia cbm field reserves accounts 1.01% of total remaining reserves of producing cbm fields globally.

For more details on the Scotia CBM Field, buy the profile here.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Oil & Gas Intelligence Center, which provides detailed profiles of 34,000+ oil and gas fields, 400,000+ exploration blocks, 1,100+ LNG terminals, 3,400+ gas processing plants, 5,000+ storage terminals, and 8,000+ pipelines, 1,400+ refineries and 13,000+ petrochemical plants worldwide.