Selva (Redevelopment) is a conventional gas development located onshore Italy and is operated by Po Valley Operations. According to GlobalData, who tracks more than 34,000 active and developing oil and gas fields worldwide, lies in block Podere Gallina and Selva Malvezzi. Buy the profile here.
The project is currently in construction stage and is expected to start commercial production in 2023. The development cost is expected to be $3 m. The Selva (Redevelopment) conventional gas development will involve the drilling of approximately one wells.
Field participation details
The field is owned by Po Valley Energy and Prospex Oil and Gas.
Production from Selva (Redevelopment)
Production from the Selva (Redevelopment) conventional gas development project is expected to begin in 2023 and is forecast to peak in 2023, to approximately 4 Mmcfd of natural gas. Based on economic assumptions, the production will continue until the field reaches its economic limit in 2047.
Remaining recoverable reserves
The field is expected to recover 2.76 Mmboe, comprised of 16.55 bcf of natural gas reserves.
Contractors involved in the Selva (Redevelopment) conventional gas field
Some of the key contractors involved in the Selva (Redevelopment) project as follows.
EPC Contractors: TESI
Other Contractors: Geotec and Hydro Drilling International
For more details on the Selva (Redevelopment) Conventional Gas Field, buy the profile here.